Container solution for sewage treatment plant

Container solution for sewage treatment plant in Erftstadt

SÜLZLE KLEIN sludge thickening for affected flood area

The Erftstadt/Köttingen wastewater treatment plant was severely affected by the flood disaster in 2021. The damage was massive in some cases. Large parts of the mechanical equipment and structural parts of the plant were destroyed.

However, the processes of mechanical-biological wastewater treatment could be restarted after only a few days thanks to loaned aggregates, several provisional solutions and the great commitment of the operating staff.

And yet: Some of the buildings and all of the sludge treatment plant components were so badly affected that they had to be redesigned and rebuilt.

For the excess sludge thickening, SÜLZLE KLEIN GMBH received the order for the delivery and commissioning of a mechanical sludge thickening system including peripherals in a container in December 2021. We are very pleased to have made an important contribution to the rehabilitation of the sewage treatment plant with this order. The fault-free acceptance of this important construction measure took place from 14 September 2022.

Images:

Whether by phone, e-mail or contact form: We look forward to your enquiry.

Do you have questions about our products and services or need further information? Our experts are happy to help you. You can reach us by phone from Monday to Friday between 8:00 am and 5:00 pm. Or write to us – by post, e-mail or conveniently via our contact form. We look forward to hearing from you!

Our experts are happy to be there for you. Don’t hesitate and feel free to call us or write to us – by post, e-mail or conveniently via our contact form. We look forward to hearing from you!

Facts and figures about the belt thickener:

70.000

Population equivalents

5 bis 35 m³/h

Sludge throughput Excess sludge

5,0 %

Solids content in thickened sludge

12.09.2022

Commissioning

To the references