Reference project in Kirchbauna
1
1

Renewal of the sludge thickening system in the existing building

Renewal of the mechanical sludge thickening system with a belt thickener

The Kirchbauna wastewater treatment plant purifies the entire wastewater of the Bauntal-Schauenburg association area. After a good 30 years of operation of the KLEIN screening drum, the mechanical sludge thickening system was renewed. In the existing building, a new belt thickener of the solidXdrain series was installed with a matching polymer treatment system of the solidXfloc type. The plant was installed on the existing foundations of the old plant, so that only minor adjustments to the periphery and structural conditions were necessary. Since the work had to be carried out during ongoing operation of the wastewater treatment plant, Sülzle Klein ensured continuous operational safety by means of a mobile sludge thickener.

Pictures:

Facts and figures about the project:

40.000

Population equivalents

10 to 35 m³/h

Sludge throughput

6 Prozent

Solids content in thickened sludge

2018

Year of manufacture

Location of the reference project:

Baunatal

County Kassel
Hessen

Google Maps