Renewal of the sludge thickening system in the existing building

Renewal of the mechanical sludge thickening system with a belt thickener

The Kirchbauna wastewater treatment plant purifies the entire wastewater of the Bauntal-Schauenburg association area. After a good 30 years of operation of the KLEIN screening drum, the mechanical sludge thickening system was renewed. In the existing building, a new belt thickener of the solidXdrain series was installed with a matching polymer treatment system of the solidXfloc type. The plant was installed on the existing foundations of the old plant, so that only minor adjustments to the periphery and structural conditions were necessary. Since the work had to be carried out during ongoing operation of the wastewater treatment plant, Sülzle Klein ensured continuous operational safety by means of a mobile sludge thickener.

Pictures:

Whether by phone, e-mail or contact form: We look forward to your enquiry.

Do you have questions about our products and services or need further information? Our experts are happy to help you. You can reach us by phone from Monday to Friday between 8:00 am and 5:00 pm. Or write to us – by post, e-mail or conveniently via our contact form. We look forward to hearing from you!

Our experts are happy to be there for you. Don’t hesitate and feel free to call us or write to us – by post, e-mail or conveniently via our contact form. We look forward to hearing from you!

Facts and figures about the project:

40.000

Population equivalents

10 to 35 m³/h

Sludge throughput

6 Prozent

Solids content in thickened sludge

2018

Year of manufacture