Referentie project in Lachendorf

1
1

Renewal of belt thickener and new construction of belt filter press for dewatering of ÜS sludge and digested sludge

Renewal of the mechanical sludge thickening system and new construction of the sludge dewatering system

The Lachendorf wastewater treatment plant belongs to the Matheide wastewater association and treats the entire wastewater of 18,000 population equivalents. As part of the climate protection sub-concept “Climate-friendly wastewater treatment”, the sludge thickening system was replaced by a solidXdrain belt thickener and extended by an energy-efficient solidXpress belt filter press.

The new equipment was installed centrally and compactly in an existing room. For the renewal of the mechanical sludge thickening system, a mobile belt thickener was provided to ensure the operation of the wastewater treatment plant.

Pictures:

Facts and figures about the belt thickener:

18.000

Population equivalents

10 to 15 m³/h

Sludge throughput Excess sludge

6 %

Solids content in thickened sludge

2015

Year of manufacture

Zahlen und Fakten zur Bandfilterpresse:

18.000

Population equivalents

10 to 15 m³/h

Sludge throughput Excess sludge

18 to 20 %

Solids content in dewatered sludge

2015

Year of manufacture

Standort des Referenzprojekts:

Lachendorf (Celle)

County Celle
Niedersachen

Google Maps

By loading the map you accept the privacy policy of this website and Google
Privacy policy Google
Privacy policy of this website

Load map

References